Own the numbers. Command the room.

Offline governance instruments for hybrid projects and portfolios — PMBOK 8-aligned, fully auditable, and yours to own. No cloud. No account. Every number shows its working.

Inside the vault

The numbers are yours now.

Eight projects, one source of truth, nothing leaving this room. Let's make the figures say something.

Read on ↓

Every steering committee ends on one question: “what is the real status?”

P6 says one date. Jira says another. The spreadsheet is a week behind both.

“Probably fine” holds the room a quarter. Maybe two.

Authority is the distance between “probably” and “here are the numbers.”

Steer reads both worlds, separates real slippage from a methodology mismatch, and shows the figures behind every call. The hardest question in the room stops being the one you fear.

13%
of projects fail outright, money and time written off.
PMI Pulse of the Profession · 2025
52%
of projects suffer scope creep that the early numbers never caught.
PMI · 2018
45%
average cost overrun on large IT programs, against the plan they were sold on.
McKinsey · University of Oxford · 2012
First of its kind

Hybrid portfolios, reconciled — not just merged. The first to tell slippage from a methodology mismatch, fully offline.

The catalog

Two lines. One refusal to fake anything.

Instruments that run a whole portfolio or a single project — live, offline, and sourced. A Library of the documents a serious PM reaches for on day one. Nothing here phones home.

The Instruments · Portfolio

Govern a whole estate at once: many projects, mixed methods, one source of truth.

The Instruments · Single project

One project, run with the same rigor as a hundred: the portfolio engines, focused to a single team. Each ships a live offline demo with its hero views open — including the Root-Cause Lab.

Own an instrument

The instruments are premium, licensed per organisation and priced by enquiry. Fly the live demos, then talk to us about access for your team.

Talk to the founder →
Live demos · on this page

No screenshots. No videos. Fly the real products.

These are the actual PM Vault instruments, loaded with sample data and running in your browser tab. Pick one below — the Steer flagship, or a single-project edition. Each opens its hero views; every other view stays visible but locked. Nothing is uploaded, nothing is staged footage.

Project Atlas

CPI 0.916, TCPI 1.143. Steer calls the divergence and shows you the arithmetic behind the verdict.

Project Helix

P6 reports 40% complete. Jira reports 100%. Steer flags a methodology mismatch, not a slip.

Portfolio blend

63.3% complete, built from 8 weighted contributions you can open, trace, and audit.

Demo theater · sample data · runs locally

PM Vault Steer. The PMO command deck.

Boots the real product into this page with three hero views open: the Helm, the Reconciliation Center, and schedule-and-cost risk simulation, on a mixed P6-and-Jira estate.

LIVE, runs in this page. Nothing is uploaded, nothing leaves your machine
0

Automated checks, zero failures

The release gate that this exact build passed before it was allowed near you.

0

Bytes of your data uploaded

Your portfolio never leaves your machine. Steer contacts exactly one address, for seat licensing, and it carries none of your project data.

0

Command views

Decide, diagnose, reconcile, forecast and govern, in three boardroom themes.

0

Seeded Monte Carlo trials

Per forecast, reproducible by seed. Same inputs, same answer, every time.

Audited, not asserted

Most tools ask for faith.
Ours hand you the test log.

Before a build is allowed near you it passes its own release gate: tens of thousands of automated assertions, its engine checked number-for-number against an independent reference, and a network audit that proves your data stays put. These are the real figures from the gate each instrument passed — every one traceable to a report on disk.

Steerhybrid · portfolio
57,819
automated checks · 0 failures
  • 147 / 0 vs an independent Python engine
  • 10,000-run seeded Monte Carlo, reproducible
  • 23 command views · engineering gate green
Cadenceadaptive · flow
68,790
automated checks · 0 failures
  • 27 / 0 vs an independent Python engine
  • 6,000-run throughput Monte Carlo, seed-identical
  • 24 views × 3 themes render clean
Convergehybrid · single project
13,050
automated checks · 0 failures
  • 147 / 0 vs an independent Python engine
  • Independent audit 4.3 / 5 · PASS
  • Zero external requests · 25 views
Foresightpredictive · single project
4.5 / 5
independent audit · PASS
  • 10,000-run reproducible Monte Carlo
  • 21 / 21 engine validations: EVM, Earned Schedule, DCMA-14
  • Zero external requests · 26 views

Every figure here comes from a release report on disk, not a marketing deck. See the standards each instrument cites →

The Library

Start free. Arm yourself for the price of lunch.

The documents a serious PM reaches for on day one — sourced to the standards, in three boardroom themes. Take the Field Guide free; the rest are at founding prices for a limited time. Instant download. 14-day money-back, no questions.

★ Founding launch prices · limited time
PM Vault Field Guide — Essentials, cover Free for everyone

Field Guide — Essentials

Free

Your first 90 days as a PM, turned into a plan you can actually run.

  • The 30/60/90 plan, step by step
  • 8 focused chapters, every claim sourced
  • PDF + DOCX · 3 boardroom themes
Download free →
No card. Yours to keep.
PM Vault Field Manual — Complete, cover Save 70% · limited time

Field Manual — Complete

$15$50−70%

The full PM operating system — predictive, adaptive and hybrid governance, end to end.

  • 70–90 pages with a worked sample project
  • Every practice cited to the standards
  • PDF + DOCX · 3 boardroom themes
Get founding access →
Founding list locks the launch price
PM Vault Day-One Toolkit, cover Save 67% · limited time

Day-One Toolkit

$20$60−67%

Months of spreadsheet-building, already done — a live dashboard and the working tabs behind it.

  • Live dashboard + every working tab
  • XLSX, ready to use day one
  • 3 boardroom themes
Get founding access →
Founding list locks the launch price

This page is running a real forecast. Right now.

Most tools hand you a date and ask for faith. Our instruments simulate, show the distribution, mark the confidence, and publish the method, the history, and the seed. Here is that principle, live, in miniature.

methodbootstrap Monte Carlo
history12 weeks throughput
remaining85 items
seed42
trials0
simulating…

Your portfolio belongs in a vault.
Not in someone else's cloud.

No server. No account. No telemetry. Every instrument ships with a Content-Security-Policy that blocks every external host, so even a future bug could not leak your data.

Disconnect the network. Everything still works.

The line continues. The list flies it first.

Watch, Gate and Count are in build now, to the same law Steer passed: offline, glass-box, zero egress, released only when the gate is green. Founding members get first access and founding pricing on each.

Watch In build

Adaptive delivery governance

Agile work is governed by vigilance, not stage reviews. Watch stands guard over flow: WIP limits that bite, aging work surfaced before it festers, and a forecast gate that visibly refuses to guess from thin data.

concept: the aging-work early-warning strip

Gate In build

Predictive controls & baseline governance

You pass the gate or you don't, and Gate shows you why: earned value and earned schedule against the approved baseline, with schedule-risk simulation a claims reviewer would respect.

concept: the S-curve meets the brass gate line

Count In build

Cost governance · finance & pricing

BOQ to baseline, EAC workbench, risk-priced bidding, and a month-end close that locks for good.

concept: the period-close lock
Founding list · one launch

Own your instruments
before everyone else does.

Founding pricing exists once, at launch, for the whole line. The list gets it, plus the build log as it happens and first flight on Watch, Gate and Count.